Tuesday, September 24, 2019

Sierra Club's Service Project in Rocky Mountain National Park

Twenty Sierra Club members and two outings leaders met at the YMCA of the Rockies abutting Rocky Mountain National Park for a week of volunteer service to the national park. We stayed in a large 5 bedroom, 2 bathroom YMCA cabin called the Ranch House. The full kitchen had two refrigerators, two microwaves, two stoves, two ovens, and two dishwashers, which made meals much easier. Unfortunately, all 22 of us had to share just two bathrooms.

We were ably led by National Park Service rangers/biologists Kate, Camille, and Jesse, and for four days we worked a variety of tasks. Many of us were surprised to learn that RMNP is one of just 14 national parks with state-of-the art greenhouses and plant nurseries and that the biologists did extensive work eliminating invasive plant species and re-planting areas where human interference had injured the park flora. And since the park has different species of plants on the east and west sides of the mountains, each area gets only the plants appropriate to its side. Also, since the high alpine areas like Long's Peak at 14,259 feet elevation (the highest point in RMNP) have yet a third type of flora, the rangers hike up there to harvest seeds from up high as well as to revegetate the alpine areas with flora grown from those seeds. The greenhouse produces between 35,000 and 55,000 plants annually for restoration work! Once, a small Ziplock bag full of bear scat collected by a ranger had enough small berry seeds to grow 1200 seedlings of Oregon grape and chokeberry.

The first day we went to Moraine Park Campground and removed invasive monk and bull thistle seed pods seen below as round purple, white, and brown balls...





...as well as invasive mullein weed, seen below being held by ranger Camille...





Covering 48 acres, our group carefully removed the seed pods from these three varieties to prevent more infestation, and then we dug out the offending plants.  The seed pods were placed into paper bags as seen above and taken back to the nursery area, where the bag and contents will be incinerated by this monster machine...





The bags are placed in the burn box and the flames come from the holes seen along the top right edge of the burn box...




On day 2, we were driven over the mountain to the west slope's Timber Creek Campground. A new sewer pipe had been buried in the campground and such human "disturbances" of the natural terrain have to be remediated, so we raked a narrow swath totaling  just over half an acre to loosen the soil. 







Camille and Jesse then spread the native Bromine grass seed on the loose soil...


...which we then raked into the soil...






...and then we covered it all with mulch to keep birds and other critters from finding and eating the seeds.




In the photo below, you can see about half of the area we worked on. The winter snows will blanket the area, and after melting next spring, the moisture will allow the seed to grow and once again the disturbed area will have native grass and blend in with the natural look.





On day three, we were taken to the Glacier Basin Campground area where some of our group planted about 350 junegrass plugs within a fenced enclosure...








...and then they collected the seeds of the bottlebrush squirreltail, a wild rye, cool-season, quick establishing but short-lived perennial bunchgrass seen below. The seeds were taken to the greenhouse to grow more plants for future use.




Meanwhile, five of us worked on improving the "security" of the encircling fence, which meant adding fine mesh to prevent critters from being able to climb through or up and over the fence as they attempt to reach the enticing young plantings.





The fence is already buried 18 inches into the ground to keep moles out, but agile animals can climb the fence, so we extended the height of the tight mesh fencing...




...and then curled the top to impede climbing over the top.




On the fourth day, we all went to the greenhouse/nursery area. Two varieties of plants which had been started in small cone-shaped containers had outgrown them and needed to be replanted in larger containers. Below, I am holding the container and the young plant which I have removed prior to replanting it in the round container on the table.





We transplanted over 500 plants into the larger containers where they will spend the winter before being replanted where they are needed next year.





Here are some of larger containers we had filled. The plants are below ground level for protection and they will be blanketed with a deep cover of mulch all winter, and next year they will be dug out of the mulch and then transplanted into the ground where needed.




At the same time, a crew was digging in the rock-laden ground to clear and level a below ground space for Jesse's planned hoop-and-plastic covered enclosure, beneath which more plantings will spend the winter until replanted next year.









We finished the day with a tour of the greenhouse with its fans and heaters and air conditioners and retractable roof. Kate and Camille explained the operation of the greenhouse and how it is vital to their mission.





A Ziplock of bear poop once yielded 1200 seedlings of orange grass and chokeberry!





Each day, our ranger-leaders were congenial and patient with us neophytes, explaining what to do and why we were doing it, calmly answering all our questions, and proficiently demonstrating how to perform the tasks we had been assigned.


Camille






Jesse and Kate





And special thanks to our Sierra Club leader, Jim...





...and also our innovative and tireless cook extraordinaire, Robin!



And here's our stalwart crew of Sierra Club members who traveled from all over the country to assist in this week's efforts!





47 photos are available for download from Shutterfly here

Here's a brief video of our week's project:





Monday, September 23, 2019

Biking Aurora's Toll Gate Creek Trail

This trail connects the High Line Trail to Quincy Reservoir. To access the trail, I parked at Aurora's Horseshoe Park using this address for GPS directions:  2125 Kittredge Way.




On this trail, you'll find a myriad of possible paved routes to take, most of which are for access from neighborhoods. Signs as seen below often will direct you to stay on the actual trail, but there are places where you could be confused and have to turn around to find the actual trail.



It is helpful that trail maps are regularly located along the trail showing where you are.





The trail is paved and mostly in good shape as it follows the flood canal, occasionally changing sides via bridges. There are a few road crossings as well as several underpasses along the route.



You'll find scenic areas as well as residential areas along the route.








The trail connects the High Line Trail to Quincy Reservoir. In  addition to Horseshoe Park, parking is available as Quincy Reservoir off Quincy Avenue, as well as at Aurora Municipal Center at 15151 E. Almeda Parkway.





Biking High Line Canal Trail

The High Line Canal Trail travels through Denver's southern suburbs for 71 miles between Aurora and Roxborough State Park. Denver Water operates the trail which follows the canal that keeps Denver watered, though other municipal agencies help manage the trail system.




Signage helps keep you on the trail as it meanders around...



The trail does abut numerous residential areas, some right up to the trail, but there are also many areas where you get to enjoy nature.


The trail passes through many parks, each of which offer different amenities (drinking fountains, picnic tables, restrooms, parking, recreation facilities). 








The trail is paved in Denver and Aurora but has a natural surface in South Suburban, Highlands Ranch, Chatfield, Cherry Hill, and Greenwood Village.





In several section, I noticed this audience. Many of the prairie dogs scampered into their holes, but some were brave or curious enough to watch me. The local news also warned that the cute critters can pass on diseases.




The trail took me alongside Hinkley High School at lunch time, and students were on and blocking the trail, as was a food truck selling to the students. Avoid this if you can!

Tuesday, September 3, 2019

Biking Greater Denver's Sand Creek and Creekside Trails

The 14 mile Sand Creek Regional Greenway Trail traverses Commerce City, Denver, and Aurora, Colorado. I biked the section through Denver and Aurora which is unpaved but my mountain bike had no problem. Others on the trail all had hybrids or fat tires. The north end of the trail, in Commerce City, is paved. The Greenway ends in Aurora at Colfax Avenue, where it connects with the High Line Canal Trail. I love the "motto of the trail -- "Wilderness in the city."










Along the route I saw industrial areas...




 a few neighborhoods...



... as well as some parks and small lakes.



 I also passed both Bluff Lake Nature Center and and Star K Ranch Natural Area's Morton Nature Center and some lovely heavily treed areas. 




Eventually, the trail will span 28 miles and connect the South Platte Greenway to the Aurora Reservoir.

When the Greenway is completed, it will include:
  • Two parallel trails: one gravel, one paved
  • Three signature parks: one each in Aurora, Commerce City, and Denver
  • Multiple trailheads to accommodate cars, horse trailers and horses
  • Neighborhood trail links to existing and new neighborhoods in each city
  • Amenities such as restrooms, water fountains, benches, shelters and picnic tables
  • Preserved and enhanced natural areas and wildlife habitats
  • Interpretive educational signs

There is also a single track side trail for mountain bikes which parallels the main trail. Though it has some short sections with deep sand, it is a fun side trail and has several exits back to the main trail for those who wish to abort...